Construction works in a biogas water treatment plant (WWT)
Works carried out:
- Structural calculations
- Nr.1 anaerobic digester with biogas protection, insulation, construction and installation of logs
- Nr.1 oxidation and denitrification tank
- Nr.1 clarifier with central cone
- Nr.1 final well tank
- Nr.1 purification tank
- Nr.1 biomass tank
- Nr.1 platform for whey tank
- Nr.1 bed for shredder
- Nr.1 platform for heating and blood tanks
- Nr.1 platform for shredder wagon
- 5 other different basements
- Nr.1 technical room
- Nr.1 platform for cogenerator
- Demolition of existing accumulation tank attic
- Used of Cemi Energy biogas special biogas formwork for circular tanks