MAPEI Polyglass CCHP

Industrial sector

Pharmaceutical industry

Project
CHP system construction works in the pharmaceutical sector

Works carried out:
-structural calculations
- basement for a 3.3 MWe trigeneration plant
- lithium bromide absorber basement
- External storage skid basement
- condensate drain line
- under-services and man-made underpasses
- plant grounding
- inspection wells
- cable ducts for Medium Voltage lines and LV power lines
- underground hydraulic lines
- asphalt and access roads to the cogenerator and to the absorber
- asphalt floors
- disassembly and dismantling of an old CHP CAT plant

TOP